Lucideon sets out £500m plan to make advanced ceramic parts at Keele
The Stone-based materials company wants to build a UK factory and research centre for ceramic matrix composites on Keele's science park, but the plan depends on just over £200 million of government money that has not been confirmed.
The Potteries has been firing clay for centuries, and the next chapter in that story could be written a few miles up the road at Keele. Lucideon, a materials technology company headquartered in Stone, has set out plans for a centre costing more than £500 million to make ultra-tough ceramic parts for aerospace, defence, space and nuclear energy, with a site earmarked on Keele University's Science and Innovation Park.
The plan was announced through a press release, versions of which appeared on Keele University's news pages, in the trade title The Manufacturer and on the website of the Nuclear Industry Association, a trade body. The trade versions carry a few extra details, but all three rely on quotes from Lucideon and supporters of the plan. None includes a response from government or any independent assessment, so the figures below are the company's own.
What it would make
The centre would make ceramic matrix composites, known as CMCs. These are ceramics with ceramic fibres running through them, a mix that keeps them light while letting them survive extremely high temperatures and sudden heat or impact without shattering. According to the announcement, demand for them is growing worldwide but the UK cannot currently supply them securely.
Advert spaceWant your ad here?300 × 250 boxEnquire about this space →Lucideon's chief executive, Tony Kinsella, described this as a market failure. He said sectors including aerospace, space and nuclear energy lack a sovereign, meaning UK-owned, manufacturing capability, leaving supply chains exposed and creating risks to energy and wider security. He said a UK facility would reduce dependence on international suppliers and create high-value jobs in the Midlands. "It’s an ambitious plan, which builds on the history and expertise of ceramics in Staffordshire," he said.
The plans cover both oxide and non-oxide composites. Lucideon's own news pages from 2023 show it was already working on both types, listed there as Ox/Ox and SiC/SiC, along with forming, sintering and a process called polymer impregnation pyrolysis.
Where and how much
The earmarked site is on Keele University's Science and Innovation Park, part of the planned Keele Innovation District. The park's director, Ann Pittard, said she expected the centre to bring well-paid, high-value manufacturing jobs to north Staffordshire and the wider Midlands, and called it a fitting anchor for the district.
The total is estimated at more than £500 million over seven to ten years, covering equipment, people, research and technology development, buildings, validation and certification. Private funding is part of the plan, but it would also need just over £200 million from government.
Lucideon would lead the scheme through a joint venture with industry partners, working with research and development partners. None of those partners has been named. The Manufacturer and the Nuclear Industry Association both report that two new companies, Oxide Ceramic Systems and Non-Oxide Ceramic Systems, have been set up to take the work forward. Companies House records confirm that Oxide Ceramic Systems Limited and Non-Oxide Ceramic Systems Limited were both incorporated on 17 July 2026, listed at Lucideon Group's address on Brooms Road, Stone Business Park.
The Manufacturer adds that Lucideon showed its CMC manufacturing techniques at the Farnborough International Airshow.
The AMRICC link
At the centre of the plan is the AMRICC Centre in Stone, described in the announcement as the UK's Centre for Advanced Ceramics. It came out of an £18.27 million grant from UK Research and Innovation's Strength in Places Fund, awarded in 2021 to the Midlands Industrial Ceramics Group. Lucideon hosts and runs it as an open-access, pilot-scale facility, meaning outside organisations can use it to trial products at commercial scale.
A Lucideon review of the centre's first year, published in December 2023, described it as a £10 million facility with more than 350 pieces of equipment. It said Lucideon had invested over £4 million as the overall financial sponsor, and named Churchill China and Johnson Tiles as early users.
Rob Flello, chief executive of the trade body Ceramics UK, said in the announcement that the new centre would be a major investment in the UK ceramics industry and would support industrial resilience.
What hasn't been said
The announcement gives no job numbers, no start date, no planning application and no detail on whether government funding has been applied for or agreed. The joint-venture partners are not named, and no customer orders are mentioned. The claim that the UK has no secure CMC supply comes from Lucideon, which stands to lead the project.
What this means for your business
- This is a proposal, not a confirmed build. Nothing changes for local firms until the government funding question is settled, and no timetable for that has been given.
- If it goes ahead, a project of this size over seven to ten years would need construction, engineering, testing, equipment and specialist suppliers. Firms in those trades may want to watch for planning and funding news.
- Ceramics and materials businesses can already use the open-access AMRICC Centre in Stone to trial products at pilot scale, and it sits at the heart of the plan.
Sources
- Keele University: Plans revealed for new £500m centre for advanced ceramics research based at Keele (13 Aug 2026)
- The Manufacturer: Lucideon reveals £500m plan to manufacture ceramic matrix composites (12 Aug 2026)
- Nuclear Industry Association: Lucideon reveals £500 million plan to manufacture ceramic matrix composites (12 Aug 2026)
- Companies House: company search results for Oxide Ceramic Systems (accessed 17 Nov 2026)
- Lucideon: Landmark year for £10 million open-access AMRICC Centre (Dec 2023)
- Lucideon: A new era for ceramic matrix composites (Oct 2023)
Spotted a mistake? Read our corrections policy and tell us. How this story was put together: the newsroom.